Gas Pressure Reduction Station Instrument Upgrade

Fuel feed gas AGL Torrens Island: Torrens Island, S.A. Scope: - Gas skid B1, B2, B3 and B4 instrumentation upgrade. - Instrument tubing. - Instrument cabling run, installed and connected. - Connection to Yokogawa plant wide control system. - Cable ladder, marshalling cabinet construct and install, trenching, earthing and hazardous area connections. Safety: - Zero Lost Time Injuries. - Zero Medical Treatment Injuries. Completion: November 2019.

Fuel feed gas

AGL Torrens Island: Torrens Island, S.A.

Scope:
– Gas skid B1, B2, B3 and B4 instrumentation upgrade.
– Instrument tubing.
– Instrument cabling run, installed and connected.
– Connection to Yokogawa plant wide control system.
– Cable ladder, marshalling cabinet construct and install, trenching, earthing and hazardous area connections.

Safety:
– Zero Lost Time Injuries.
– Zero Medical Treatment Injuries.

Completion:
November 2019.