Outdoor salt water pumping station MCC
Air Liquide: South Australia
Scope:
– Design completion and fitout.
– Manufacturing supervision of the custom stainless steel 3 bay enclosure.
– In factory fitout of PLC, VSD, air conditioner and switchgear.
– In factory MCC electrical wiring.
– In field installation and quality check prior to power up.
Safety:
– Zero Lost Time Injuries.
– Zero Medical Treatment Injuries.
Completion:
December 2016.