GPS time synchronization receiver installed and connected to the Plant Wide control system
Stanwell: Far North Queensland power station
Scope:
– Design and issue drawings.
– Procure equipment, stage and test.
– Design lightning protection circuits and select equipment.
– Complete a site installation and quality plan.
– Install GPS receiver and lightning arrestors on site, run cabling to Plant Wide control system.
– Configure software in control system to synchronize time automatically.
– Test and hand over
Safety:
– Zero Lost Time Injuries.
– Zero Medical Treatment Injuries.
Completion:
March 2016.