Power Generation
AGL: Torrens Island
Scope:
- Design new electrical control board.
- Disconnect and remove existing board.
- Install new board and interface to Yokogawa.
- Commission and test on operating facility.
Safety:
- Zero Lost Time Injuries.
- Zero Medical Treatment Injuries.
Completion:
October 2020.
Scope: – Design new electrical control board. – Disconnect and remove existing board. – Install new board and interface to Yokogawa. – Commission and test on operating facility.
Safety: – Zero Lost Time Injuries. – Zero Medical Treatment Injuries.