Hazardous Area Electrical Upgrade

Fuel gas inlet to turbine

Stanwell Power Station: Mica Creek

Scope:
– Complete gas skid inspection.
– Upgrade equipment.
– Upgrade earthing.
– Upgrade Hazardous Area Dossier.

Safety:
– Zero Lost Time Injuries.
– Zero Medical Treatment Injuries.

Completion:
August 2018.

Field Instruments Calibrations

Plantwide service during planned maintenance

Air Liquide Oxygen Plant: Port Pirie

Scope:
– Pressure and temperature field calibrations.
– Rectify faults.
– Issue calibration certificates.

Safety:
– Zero Lost Time Injuries.
– Zero Medical Treatment Injuries.

Completion:
August 2018.

AB Powerflex 753 VSD Supervisory Control Configuration

Fuel Terminal

Mobil Fuel Terminal: Birkenhead

Scope:
– Configure Foxboro DCS to provide supervisory control.
– AB Powerflex 753 used to control load out pump.
– Alarms and displays.
– 98 Premium unleaded fuel.

Safety:
– Zero Lost Time Injuries.
– Zero Medical Treatment Injuries.

Completion:
July 2018.

GE Gas Turbine Return to Service Engineering and Field Services

Instrumentation Calibration and Control System Test Prior to Return to Service

Stanwell Power Station: Mica Creek

Scope:
– Calibrate gas turbine instruments.
– Completion of inspection and test.
– Adjust control system logic as required.
– Assist in commissioning.

Safety:
– Zero Lost Time Injuries.
– Zero Medical Treatment Injuries.

Completion:
March 2018.

Energy Consumption, Demand, Billing and Monitoring

Electrical Switchboard Manufacturers

Decon Corporation: Melbourne

Scope:
– Design and construct energy monitoring and analytics information system.
– Installation supervision.
– Configure and install the InformDB Technology Stack.
– Design and deliver display dashboards.

Safety:
– Zero Lost Time Injuries.
– Zero Medical Treatment Injuries.

Completion:
January 2018.

Clean Room Environmental Monitoring System

Design, Construct and Install an Environmental Monitoring System for Clean Rooms

Zoetis Pharmaceutical: Parkville

Scope:
– Design and construct pharmaceutical clean room monitoring system.
– Factory manufacture.
– Configure and install the InformDB Technology Stack.
– Deliver to GMP requirements.

Safety:
– Zero Lost Time Injuries.
– Zero Medical Treatment Injuries.

Completion:
November 2017.

Hazardous Area Gas Skid Upgrade

Inspect and Re-Design of Hazardous Area Gas Skid

Stanwell: Queensland

Scope:
– Hazardous area Detailed Inspection for gas feed to power turbine.
– Document findings and redesign to make safe.
– Quality management.
– Commissioning assistance.

Safety:
– Zero Lost Time Injuries.
– Zero Medical Treatment Injuries.

Completion:
October 2017.

Distributed Control System Migration to ABB Platform

Documentation of Control Loops and Commissioning Assistance

Australian Paper: Maryvale Mill

Scope:
– Document control strategy.
– Create control loop documentation to suit input into ABB DCS.
– Quality management.
– Commissioning assistance.

Safety:
– Zero Lost Time Injuries.
– Zero Medical Treatment Injuries.

Completion:
September 2017.

Power Station Water Plant Upgrade

Process instrumentation and tubing

Stanwell: Queensland

Scope:
– Install water analyzers.
– Source and install process instrumentation.
– Complete wet rack tubing.
– Commissioning assistance.

Safety:
– Zero Lost Time Injuries.
– Zero Medical Treatment Injuries.

Completion:
August 2017.

Serial Communications Upgrade

Field wiring for DCS Serial Gateways Upgrade

Stanwell: Queensland

Scope:
– Install and energize control enclosures.
– Run serial cables for all communication gateways.
– Run fibre optic cabling for upgraded communications links.
– Commissioning assistance.

Safety:
– Zero Lost Time Injuries.
– Zero Medical Treatment Injuries.

Completion:
July 2017.